Perth Toll Intermodal – Wharf Services
To supply, install and commission lighting, power, LV Switchboards, LV Mains and Submains cabling, C-Bus lighting control system, container yard and car park pole lighting and voice & data communications infrastructure.
Perth Toll Intermodal – Wharf Services
The Project
To supply, install and commission lighting, power, LV Switchboards, LV Mains and Submains cabling, C-Bus lighting control system, container yard and car park pole lighting and voice & data communications infrastructure.
Timeline
The project commenced in October 2014 and completed in July 2015.
Overview
The new facility occupies 4.3 hectares in the Rous Head Industrial Park, including a 6,000 square meters Warehouse and cross-dock and a 2,500-capacity container park and weighbridge.
The Container park 1000w metal halide floodlighting was utilized to maximize the vast areas, 25m galvanized steel technically designed hinged tilt lighting poles were manufactured to allow for ease of future maintenance by reducing the need for access equipment therefore keeping costs to a minimum.
Lighting Lux Level testing was completed to ensure lighting conditions were accurate throughout all areas.