Byford College

The Project

TES Electrical were contracted to carry out the following works, including supply, installation and commissioning of the below systems:

  • LV site main switchboard modifications
  • LV switchboards
  • Energy metering and Networking
  • Transient Surge Protection Equipment
  • Power consumption metering system.
  • Power factor correction modifications.
  • LV submains cabling
  • Cables trays, cable support systems
  • Earthing systems
  • General power distribution
  • Power to mechanical services switchboards
  • Power to hydraulic equipment
  • General & Emergency Lighting
  • Intelligent lighting control system
  • Voice and data comms infrastructure
  • MATV system
  • Performing Arts Stage Lighting System
  • Performing Arts Audio System
  • TV studio Lighting System
  • Sound field system
  • General Audio Systems
  • Photo Voltaic System
  • Electrical Radiant heating systems
  • Assistance Call Systems
  • Sound Field Systems
  • Intruder Detection System
  • Public address system
  • Testing & Commissioning

Timeline

The programme for this project included a 60 week duration with a staged handover for each of the 6 buildings. Each handover date was achieved and met with the clients satisfaction.

Overview

The works incorporated stage 2 of the ever expanding High School, which included a new Gymnasium, new state of the art Performing Arts Theatre building, Hydro-Therapy Pool, Industrial Arts Block, two general learning Blocks, & a new education support learning community block for special needs students and extended car park & walkways.

All of the above works were closely co-ordinated to ensure minimum duration to the operational existing Stage 1 School.